RAMS builder

Build your RAMS online

Independent scaffold erection and dismantling (house): answer the questions and preview a RAMS written for that job, free. Download it as an editable Word file for £9.99.

Build your RAMS online →

Rather not write it yourself? We'll write your RAMS for the job for £79, or check and fix the one you've got for £49. Back to you within 2 working days. See the RAMS services →

Typical jobs in a RAMS for scaffolders

A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs scaffolders are most often asked to write one for:

Main hazards and control measures for scaffolders

These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.

HazardTypical control measures
Falls while erecting, altering and dismantlingFollow NASC SG4 guidance, use advance guard rails and harnesses where needed, and have a rescue plan.
Materials falling onto people belowExclusion zones, hoisting rather than throwing, brick guards, fans or netting, and tools on lanyards where needed.
Scaffold collapse or overloadingBuilt to a TG20 compliance sheet or a bespoke design, ties as designed, loading limits shown on the handover.
Overhead power linesCheck before setting out, keep safe distances, and arrange shielding or a supply shutdown with the network operator if needed.
The public on pavements and roadsPedestrian routes, lighting, signage and a council licence if the scaffold is on the public highway.
Manual handling tubes, boards and fittingsPlanned deliveries, team lifts and gin wheels or hoists.

What a main contractor usually expects to see

Formats vary, but when a site manager reads a RAMS from scaffolders, they usually look for:

Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.

Worked example: one method statement step

A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.

Method statement extract · Scaffolders

Step 6: Handing over the scaffold

  1. Check the finished scaffold against the design or TG20 compliance sheet, including ties and loading bays.
  2. Make sure guard rails, toe boards, brick guards and ladder access are complete.
  3. Complete the handover certificate with the permitted loading and any restrictions.
  4. Fix a “scaffold safe to use” tag at each access point.
  5. Remove all incomplete scaffold signs and remind the client that only scaffolders may alter it.

Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement?

RAMS FAQs for scaffolders

How often should a scaffold be inspected?

HSE guidance under the Work at Height Regulations says a scaffold should be inspected after it's put up, at intervals of no more than seven days, and after anything that could affect its safety, such as high winds. See the HSE work at height guidance and check the current guidance.

Do scaffolders need a RAMS for every job?

Every job needs the risks assessed and managed. Main contractors nearly always ask for a scaffolding RAMS, and the site details (access, public, overhead lines, ties) change every time.

Does the RAMS replace the scaffold design?

No. The RAMS describes how you'll erect, alter and dismantle safely. The design or TG20 compliance sheet shows the scaffold itself is fit for its use.

Get your RAMS sorted. Our Scaffolders Health & Safety Pack (£9.99, editable Word) includes a health and safety policy, five risk assessments and a method statement written for scaffolders, ready to edit for your job. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). Prefer to answer a few questions? Build your RAMS online: free preview, £9.99 for the editable Word file.

Useful HSE guidance: HSE: work at height · HSE: construction · HSE: manual handling.

This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.

Continue readingRAMS for other trades→Risk assessment and method statement: what’s the difference?