Build your RAMS online
Re-roof of a pitched domestic roof (occupied home): answer the questions and preview a RAMS written for that job, free. Download it as an editable Word file for £9.99.
Rather not write it yourself? We'll write your RAMS for the job for £79, or check and fix the one you've got for £49. Back to you within 2 working days. See the RAMS services →
Typical jobs in a RAMS for roofers
A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs roofers are most often asked to write one for:
- Re-roofing and repairs to tiled and slate roofs
- Flat roofing: felt, single-ply and liquid systems
- Fascias, soffits, guttering and leadwork
- Roof lights and chimney work
- Industrial roof sheeting and repairs
Main hazards and control measures for roofers
These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.
| Hazard | Typical control measures |
|---|---|
| Falls from roof edges | Scaffold with edge protection, guard rails and toe boards. Don't start until the scaffold is handed over and inspected. |
| Falls through fragile surfaces and roof lights | Treat every surface as fragile until confirmed otherwise. Covers or barriers over roof lights, staging or crawling boards, and safety nets where needed. |
| Materials falling onto people below | Brick guards or netting, exclusion zones, loading at agreed points and nothing thrown from the roof. Use chutes for waste. |
| Fire from torch-on felt and hot works | Hot works permit where the site uses one, extinguisher at the point of work, no torching near combustibles and a fire check after finishing. |
| Manual handling tiles, slates and rolls | Hoists or a loading bay rather than carrying up ladders, split loads, team lifts. |
| Weather and overhead power lines | Stop work in high winds, ice or heavy rain. Check for overhead lines before setting up access. |
What a main contractor usually expects to see
Formats vary, but when a site manager reads a RAMS from roofers, they usually look for:
- Scaffold handover certificate and inspection arrangements
- How fragile surfaces and roof lights are identified and protected
- Exclusion zones and protection for the public and other trades
- A rescue plan if harnesses or nets are used
- Hot works permit and fire precautions for torch-on work
- Asbestos information for older roofs and sheeting
- Site-specific details: address, dates, access route, welfare and emergency arrangements
Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.
Worked example: one method statement step
A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.
Step 3: Stripping the existing tiles
- Check the scaffold tag shows a current inspection and that brick guards are in place.
- Set up the waste chute into a covered skip and fence off the drop zone at ground level.
- Strip tiles from the ridge down, stacking reusable tiles on the scaffold within its loading limits.
- Keep off the battens and rafters between supports; use staging where you need to cross.
- Cover the exposed roof at the end of each day or if rain is forecast.
Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement?
RAMS FAQs for roofers
Do roofers need a RAMS?
On most commercial jobs, yes, because the main contractor will ask for one before you go up. Legally, you must assess and manage the risks, and businesses with five or more employees must record the main findings.
What does a roofing RAMS need to say about fragile roofs?
It should say which surfaces are fragile or might be, and how people will be kept from falling through them, such as covers, staging, nets or working from below. See the HSE work at height guidance.
Do I need a separate RAMS for each roof?
Use the same structure, but update it for each job. Access, height, roof type and neighbours change the risks.
Get your RAMS sorted. Our Roofers Health & Safety Pack (£9.99, editable Word) includes a health and safety policy, five risk assessments and a method statement written for roofers, ready to edit for your job. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). Prefer to answer a few questions? Build your RAMS online: free preview, £9.99 for the editable Word file.
Useful HSE guidance: HSE: work at height · HSE: roof work · HSE: asbestos.
This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.