Skim plastering (occupied home): answer the questions and preview a RAMS written for that job, free. Download it as an editable Word file for £9.99.

Build your RAMS online →

Rather not write it yourself? We'll write your RAMS for the job for £79, or check and fix the one you've got for £49. Back to you within 2 working days. See the RAMS services →

Typical jobs in a RAMS for plasterers

A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs plasterers are most often asked to write one for:

Main hazards and control measures for plasterers

These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.

HazardTypical control measures
Falls from hop-ups, steps and towersStable platforms sized for the job, mobile towers erected by a trained person, and scaffold for external render.
Dust from mixing and sandingPour bags gently, mix in a ventilated area, and wear suitable RPE when mixing or sanding.
Cement and lime rendersGloves, eye protection and long sleeves, and wash splashes off quickly.
Manual handling bags and plasterboardStore close to the work, use trolleys or board lifters, and team lift boards.
Mixing paddlesTwo-handed grip, the right paddle and drill, and a firm stance.
Slips on wet floors and spillsFloor protection, clean as you go and warning signs.

What a main contractor usually expects to see

Formats vary, but when a site manager reads a RAMS from plasterers, they usually look for:

Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.

Worked example: one method statement step

A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.

Method statement extract · Plasterers

Step 3: Skimming the ceiling

  1. Set up a hop-up or platform sized to the room, checking it's level and stable.
  2. Protect floors and fittings, and keep the room closed to others.
  3. Mix in a ventilated area, pouring the bag slowly and wearing RPE.
  4. Work from the platform without overreaching; move it as you go.
  5. Clean the paddle and buckets away from drains and clear spills straight away.

Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement?

RAMS FAQs for plasterers

Do plasterers need a RAMS?

Most commercial clients and main contractors ask for one. You must always assess and manage the risks, and businesses with five or more employees must record the main findings.

What access should a plastering RAMS list?

Whatever you'll actually use: hop-ups, platforms, mobile towers or scaffold. Say who erects and checks it. See HSE's work at height guidance.

Does plaster need a COSHH assessment?

Gypsum plaster, cement renders and additives each have a safety data sheet. Use those to write the assessments. See HSE's COSHH guidance.

Get your RAMS sorted. Our Plasterers Health & Safety Pack (£9.99, editable Word) includes a health and safety policy, five risk assessments and a method statement written for plasterers, ready to edit for your job. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). Prefer to answer a few questions? Build your RAMS online: free preview, £9.99 for the editable Word file.

Useful HSE guidance: HSE: work at height · HSE: COSHH · HSE: manual handling.

This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.