Build your RAMS online
Domestic redecoration (occupied home): answer the questions and preview a RAMS written for that job, free. Download it as an editable Word file for £9.99.
Rather not write it yourself? We'll write your RAMS for the job for £79, or check and fix the one you've got for £49. Back to you within 2 working days. See the RAMS services →
Typical jobs in a RAMS for painters and decorators
A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs painters and decorators are most often asked to write one for:
- Interior redecoration in occupied buildings
- Exterior painting from ladders, towers or scaffold
- Surface preparation, filling and sanding
- Spraying walls, ceilings and joinery
- Wallpapering and specialist finishes
Main hazards and control measures for painters and decorators
These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.
| Hazard | Typical control measures |
|---|---|
| Falls from ladders, steps and towers | Choose the right access for the job, check it before use, use a trained person to erect mobile towers and don't overreach. |
| Fumes from paints, solvents and spray coatings | COSHH assessments from the safety data sheets, water-based products where possible, ventilation, and RPE when spraying. |
| Lead in older paintwork | Assume older paint may contain lead until checked. Avoid dry sanding and burning off; use wet methods and dust control. |
| Dust from sanding and filling | Sanders with extraction, suitable RPE, and sheets and barriers to protect the area. |
| Slips and trips over dust sheets and equipment | Tape sheets down, keep routes clear and tidy as you go. |
| Occupants and the public near wet paint and access equipment | Signs, barriers, agreed working hours and keeping fire exits clear. |
What a main contractor usually expects to see
Formats vary, but when a site manager reads a RAMS from painters and decorators, they usually look for:
- Access equipment you'll use and who is trained to erect it
- COSHH assessments for paints, solvents and fillers
- How occupants are kept away from the work area and fumes
- Your approach to old paintwork that may contain lead
- Fire exits and routes kept clear
- An operative sign-off sheet
- Site-specific details: address, dates, access route, welfare and emergency arrangements
Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.
Worked example: one method statement step
A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.
Step 3: Preparing the corridor walls
- Set up barriers and “decorating in progress” signs at each end, keeping the fire route open.
- Lay and tape dust sheets along the walking route.
- Fill and sand using a sander with extraction; wear a suitable mask.
- If old paintwork may contain lead, stop dry sanding and use wet methods agreed with the site contact.
- Vacuum dust before painting and keep the windows or ventilation open.
Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement?
RAMS FAQs for painters and decorators
Do painters and decorators need a RAMS?
Domestic customers rarely ask, but commercial clients and main contractors usually do. You must still assess and manage the risks, and businesses with five or more employees must record the main findings.
What's the most common gap in a decorator's RAMS?
Not saying how occupants and the public will be protected. Say where you'll work, how you'll keep people away and how fumes will be managed.
How should a RAMS deal with lead paint?
Say how you'll check for it and what methods you'll use if it's present. See HSE's lead guidance and check current advice for your job.
Get your RAMS sorted. Our Painters & Decorators Health & Safety Pack (£9.99, editable Word) includes a health and safety policy, five risk assessments and a method statement written for painters and decorators, ready to edit for your job. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). Prefer to answer a few questions? Build your RAMS online: free preview, £9.99 for the editable Word file.
Useful HSE guidance: HSE: work at height · HSE: COSHH · HSE: lead.
This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.