RAMS builder

Build your RAMS online

There isn’t a dedicated fencing contractors job in the builder yet. Patio laying (domestic) is the closest builder job for garden work; edit the steps for your fence. Free preview, £9.99 for the editable Word file.

Build your RAMS online →

Rather not write it yourself? We'll write your RAMS for the job for £79, or check and fix the one you've got for £49. Back to you within 2 working days. See the RAMS services →

Typical jobs in a RAMS for fencing contractors

A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs fencing contractors are most often asked to write one for:

Main hazards and control measures for fencing contractors

These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.

HazardTypical control measures
Striking buried services when digging post holesCheck service plans, scan with a CAT before digging, and hand dig near any marked services.
Post drivers and augersTrained operators, guards in place, hearing protection, and checking for services first.
Noise and vibrationLow-vibration tools, rotating tasks and hearing protection.
Cutting timber and metalGuarded saws, eye protection and dust masks for treated timber.
Timber treatments and postcreteGloves, COSHH assessments from the safety data sheets, and washing facilities.
Manual handling panels and postsTwo-person lifts for panels, especially in wind, and trolleys where the ground allows.

What a main contractor usually expects to see

Formats vary, but when a site manager reads a RAMS from fencing contractors, they usually look for:

Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.

Worked example: one method statement step

A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.

Method statement extract · Fencing Contractors

Step 2: Setting the posts

  1. Mark out the line and scan each post position for services.
  2. Dig the first part of each hole by hand, then use the auger if clear.
  3. Set the post, check it is plumb, and fill with postcrete following the product instructions.
  4. Cover or barrier any open holes before leaving them.
  5. Wear gloves and eye protection when mixing and pouring.

Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement? Need COSHH assessments too? See what is a COSHH assessment?

RAMS FAQs for fencing contractors

Do fencing contractors need a RAMS?

Commercial clients, councils and main contractors usually ask for one. You must always assess and manage the risks, and businesses with five or more employees must record the main findings.

Do I need to scan for services before digging post holes?

It is good practice, and many clients require it. See HSE's guidance on avoiding danger from underground services.

Do I need COSHH assessments for postcrete and treatments?

Yes for hazardous products. Use each product's safety data sheet. See HSE's COSHH guidance.

Get your RAMS sorted. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). For the supporting assessments, our Noise & Vibration Assessment Pack and Manual Handling Assessment Pack are £9.99 each as editable Word files. Or build your RAMS online: free preview, £9.99 for the editable Word file.

Useful HSE guidance: HSE: construction · HSE: COSHH.

This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.

Continue readingRAMS for other trades→Risk assessment and method statement: what’s the difference?