RAMS builder

Build your RAMS online

Replacement of domestic consumer unit (occupied home): answer the questions and preview a RAMS written for that job, free. Download it as an editable Word file for £9.99.

Build your RAMS online →

Rather not write it yourself? We'll write your RAMS for the job for £79, or check and fix the one you've got for £49. Back to you within 2 working days. See the RAMS services →

Typical jobs in a RAMS for electricians

A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs electricians are most often asked to write one for:

Main hazards and control measures for electricians

These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.

HazardTypical control measures
Electric shock and burns from live conductorsWork dead wherever possible. Safe isolation with lock-off and warning labels, prove dead with a suitable voltage indicator checked on a proving unit before and after use. Test leads and probes in line with HSE guidance GS38.
Someone re-energising a circuit you're working onPersonal locks and keys, isolation permit if the site uses one, labels at the point of isolation, agree with the site contact which circuits are off and for how long.
Asbestos in older buildings (boards, ceiling voids, cable entries)Ask for the asbestos survey or register before drilling or lifting boards in older buildings. Stop work and report anything suspect.
Falls from ladders, steps and towersRight access for the task, pre-use checks, mobile tower erected by a trained person, no overreaching.
Dust when chasing and drilling masonryOn-tool extraction, suitable RPE, chase at the planned depth and route only.
Hidden services when drilling or chasingCheck drawings, scan with a cable and pipe detector, keep to safe zones.

What a main contractor usually expects to see

Formats vary, but when a site manager reads a RAMS from electricians, they usually look for:

Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.

Worked example: one method statement step

A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.

Method statement extract · Electricians

Step 4: Safe isolation of the circuit

  1. Confirm with the site contact which circuits will be off and agree the time.
  2. Identify the correct protective device from the schedule and switch it off.
  3. Fit a personal lock and an “Electrician at work, do not switch on” label. Keep the key on you.
  4. Check the voltage indicator on the proving unit, test the circuit dead at the point of work, then re-check the indicator on the proving unit.
  5. Only start work once the circuit is proved dead. If anything doesn’t match the schedule, stop and re-check.

Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement?

RAMS FAQs for electricians

Do electricians need a RAMS for every job?

Not every job needs a written RAMS by law, but you do need to assess and manage the risks. HSE says businesses with five or more employees must record the significant findings of their risk assessment. On commercial sites, a RAMS is usually a condition of starting.

Can I work live if the client won't allow a shutdown?

HSE's position is that work should be done dead wherever possible, and live working is only justified in narrow circumstances. Read the HSE electrical safety guidance and agree a shutdown with the client rather than writing live work into the RAMS.

What should be in an electrician's method statement?

The job and location, who is doing it, the sequence of work, how you'll isolate and prove dead, access equipment, testing and handover, waste, and emergency arrangements.

Get your RAMS sorted. Our Electricians Health & Safety Pack (£9.99, editable Word) includes a health and safety policy, five risk assessments and a method statement written for electricians, ready to edit for your job. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). Prefer to answer a few questions? Build your RAMS online: free preview, £9.99 for the editable Word file.

Useful HSE guidance: HSE: electrical safety at work · HSE GS38: electrical test equipment · HSE: asbestos.

This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.

Continue readingRAMS for other trades→Risk assessment and method statement: what’s the difference?