There isn’t a dedicated dryliners job in the builder yet. Skim plastering (domestic) is the closest builder job; edit the steps for your drylining. Free preview, £9.99 for the editable Word file.

Build your RAMS online →

Rather not write it yourself? We'll write your RAMS for the job for £79, or check and fix the one you've got for £49. Back to you within 2 working days. See the RAMS services →

Typical jobs in a RAMS for dryliners

A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs dryliners are most often asked to write one for:

Main hazards and control measures for dryliners

These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.

HazardTypical control measures
Manual handling plasterboardBoard trolleys and lifters, two-person lifts for large boards, and boards stored flat and close to the work.
Working at height on ceilingsPodiums or towers instead of stepladders where possible, and board lifters so nobody holds boards overhead.
Dust from cutting and sandingScore-and-snap cutting, extracted sanders, suitable RPE, and cleaning with a vacuum, not sweeping.
Cuts from knives and metal studRetractable knives, cut-resistant gloves, and deburring stud ends.
Power tools and screw guns110V or battery tools, pre-use checks, and eye protection.
Hidden services in walls and ceilingsCheck drawings and scan before fixing into existing structure.

What a main contractor usually expects to see

Formats vary, but when a site manager reads a RAMS from dryliners, they usually look for:

Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.

Worked example: one method statement step

A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.

Method statement extract · Dryliners & Ceiling Fixers

Step 3: Fixing ceiling boards

  1. Set up the podium or tower on a level floor and check it before use.
  2. Load the board onto the board lifter and raise it into position.
  3. Fix the board with screws at the specified centres.
  4. Keep the area below clear of other trades while fixing.
  5. Lower the lifter and move the access equipment, never overreaching.

Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement? Need COSHH assessments too? See what is a COSHH assessment?

RAMS FAQs for dryliners

Do dryliners need a RAMS?

Main contractors and commercial clients usually ask for one. You must always assess and manage the risks, and businesses with five or more employees must record the main findings.

Is plasterboard dust harmful?

Sanding jointing compound and cutting board creates fine dust. HSE recommends controlling dust at source and using suitable RPE.

Can I use stepladders for ceilings?

Only for short, low-risk tasks where a better option is not practical. See HSE's working at height guidance.

Get your RAMS sorted. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). For the supporting assessments, our Manual Handling Assessment Pack and Working at Height Safety Pack are £9.99 each as editable Word files. Or build your RAMS online: free preview, £9.99 for the editable Word file.

Useful HSE guidance: HSE: working at height · HSE: construction health risks.

This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.

Continue readingRAMS for other trades→Risk assessment and method statement: what’s the difference?