Typical jobs in a RAMS for bathroom fitters

A RAMS (risk assessment and method statement) should describe the actual job, not the trade in general. These are the jobs bathroom fitters are most often asked to write one for:

Main hazards and control measures for bathroom fitters

These are the hazards that usually belong in the risk assessment, with the kind of controls a site manager expects to see. Adjust them for your job; every site is different.

HazardTypical control measures
Strip-out of the old bathroomWater isolated and drained first, checking for asbestos in older homes, and controlled removal of heavy items.
Electrics in wet areasWork in bathroom zones done by a competent electrician, and safe isolation before any electrical work.
Dust from cutting tiles and boardsWet cutting or extraction, suitable RPE, and cutting outside where possible.
Adhesives, sealants and solventsGood ventilation, gloves, and COSHH assessments from the safety data sheets.
Manual handling baths, trays and vanity unitsTeam lifts, trolleys, and planning the route through the house.
Occupied home: residents, children and petsAgreed working area, tools and materials never left unattended, and a working toilet arranged where possible.

What a main contractor usually expects to see

Formats vary, but when a site manager reads a RAMS from bathroom fitters, they usually look for:

Generic, copy-and-paste RAMS are the ones that get sent back. See the RAMS mistakes that get documents rejected.

Worked example: one method statement step

A method statement sets out the job in the order it happens. Here’s an illustrative extract for one step. Yours should match your own job and site.

Method statement extract · Bathroom Fitters

Step 1: Stripping out the old suite

  1. Isolate and drain the water supply to the bathroom.
  2. Confirm the electrics in the room are isolated if they will be disturbed.
  3. Protect the route through the house with floor and door protection.
  4. Remove sanitaryware with two people for heavy items, and cap off pipes.
  5. Stop and check if you find old boards or textured coatings that could contain asbestos.

Each step is short and specific, and names the control at the point it’s needed. New to method statements? Read what is a method statement? Need COSHH assessments too? See what is a COSHH assessment?

RAMS FAQs for bathroom fitters

Do bathroom fitters need a RAMS?

Domestic customers rarely ask, but main contractors, housing associations and commercial clients often do. You must always assess and manage the risks, and businesses with five or more employees must record the main findings.

Who can do the electrics in a bathroom?

Electrical work in bathrooms should be done by a competent electrician and may need to be notified under the Building Regulations.

Do I need COSHH assessments for sealants and adhesives?

Yes for hazardous products. Use each product's safety data sheet. See HSE's COSHH guidance.

Get your RAMS sorted. Short of time? We’ll write your RAMS for you (£79, back within 2 working days), or review and fix the one you’ve already got (£49). For the supporting assessments, our Manual Handling Assessment Pack and Asbestos Awareness Pack are £9.99 each as editable Word files. Or build your RAMS online: free preview, £9.99 for the editable Word file.

Useful HSE guidance: HSE: COSHH · HSE: electrical safety.

This is general guidance, not legal advice. Check the current HSE guidance and what your client asks for.

Continue readingRAMS for other trades→Risk assessment and method statement: what’s the difference?